5333 Connecticut Ave. Building Blog

Covering drains at Conn. X Kanawha.

27 Sep 2013

Installing orange fence around each street tree.

27 Sep 2013

Loading dump truck with rubble.

27 Sep 2013

Backhoe clearing debris.

26 Sep 2013

Removing trunks from Kanawha St. side.

25 Sep 2013

Southwest corner

24 Sep 2013

From Connecticut Ave. looking east

24 Sep 2013

Connecticut Ave. "stone wall and steps"

24 Sep 2013

More signs posted in east-side alley

23 Sep 2013

Plans posted in east-side alley

23 Sep 2013

East-side alley and gate

23 Sep 2013

4. Week of Monday, 23 September, 2013

        Welcome Live Stream Building Blog Slideshows Q&A Misc

Previous / Next

Monday, 23 September, 2013 to

Friday, 27 September, 2013

Blog, Photos and Videos in reverse chronology.

Select thumbnail at the left for larger photo.

• Friday, September 27, 2013

- Finished clearing and finished double fencing

Military side.

- Loaded dump trucks with rubble.

- Installed orange fence around each tree in street

tree boxes.

- Covered north and south gutter drains at

Connecticut and Kanawha.

• Thursday, September 26, 2013

- Cleared brush and underbrush on Military side.

• Wednesday, September 25, 2013

- Construction started late.

- Clearing brush and underbrush on Military side.

- Trucked away large tree trunks from Kanawha

side.

• Tuesday, September 24, 2013

- No construction activity.

Monday, September 23, 2013

- After being approached by the police, the

Grundy Construction company honored the Stop

Work Order Notice posted 20 Sep 2013. By late

afternoon, posted Stop Work Order was gone from

gate.