5333 Connecticut Ave. Building Blog

Select thumbnail for larger photo of

comparison of Monday, 23 June, 2014 to Saturday, 28 June, 2014

Managing concrete.

28 June 14

Pouring concrete.

28 June 14

Pouring concrete.

28 June 14

Pouring begins.

28 June 14

Before the pour, south west side.

28 June 14

First crane bucket of cement.

28 June 14

Queue starts at the gate at 7:15A.

28 June 14

Site Closeup.

28 June 14

Q18: Post tension cables cellar level 01 from Senior Supervisor

27 June 2014

Ordered grid over blue post tension cables.

27 June 2014

Ordered grid.

27 June 2014

Site Closeup.

27 June 14

Ordered cables onsite, surveyor on Connecticut Ave sidewalk.

26 June 2014

South side from gate.

26 June 2014

West side from gate.

26 June 2014

Gate at Military Rd.

26 June 2014

Ground floor and 2nd floor garage underneath.

26 June 2014

Rebar cages.

26 June 2014

Site Closeup.

26 June 14

NE corner, at the gate.

25 June 2014

East wall.

25 June 2014

Mysterious blue wires.

25 June 2014

Ordered chaos, south side.

25 June 2014

Multi levels, north side.

25 June 2014

North wall.

25 June 2014

Site Closeup.

25 June 14

Progress on the south side.

23 June 2014

In the shadows of the far left (east) is the beginnings of the garage ramp.

23 June 2014

Site Closeup.

23 June 2014

43. Week of Monday, 23 June, 2014

        Welcome Live Stream Building Blog Slideshows Q&A Misc

Previous / Next

Monday, 23 June, 2014 to

Saturday, 28 June, 2014

Blog, Photos and Videos in reverse chronology.

Select thumbnail at the left for larger photo.

• Saturday, 28 June, 2014

- Video - Managing Concrete

- The early AM queue of cement trucks at the

Military Rd gate marked today as a cement day.

Cement was offloaded into the crane bucket,

delivered to the floor structures on the west side,

and managed into its productive format. A full

crew worked hip deep in cement. (0:13 min)

• Friday, 27 June, 2014

The Senior Site Supervisor answered questions

about the blue cables -- post tension cables --

and the gang forms, as the ant hill grew more

orderly. Unlike the other days this week when the

crew worked until 7P, work stopped at about

3:30P.

• Wednesday, 25 June, 2014

• Thursday, 26 June, 2014

- Video - Wednesday, 25 June, 2014

The video and the photos to the left show the ant

hill pushing higher.

• Tuesday, 24 June, 2014

The Ant Hill At Work: All over the site, there was

activity that was dramatic only in before and after

photos; watching the work real time was as

tedious as watching ants at work. About half of

the crew worked late until just before 7P.

•  Monday, 23 June, 2014

- Video The video activity was in the NE corner,

just above center, and in the NW corner, just to

the left of the center tree; two video viewing are

necessary to watch the activity in both places

- There were dramatic visual changes today. The

ramp down to the basement parking took shape.

The below-ground retaining wall were almost

finished, cemented up to the ground floor. The

gang forms for several walls on the Connecticut

Ave side went up quickly. And work continued on

the the cement pillars for the next level.