Monday, 18 November, 2013 to
Saturday, 23 November, 2013
Blog, Photos and Videos in reverse chronology.
Select thumbnail at the left for larger photo.
☆ ☆ Video
With leaves gone, the activity closer to
Connecticut Ave, and the mound of dirt on the
Connecticut Ave side removed, the photos and
videos are much more informative… and more
interesting.
Saturday, 23 November, 2013
☆ YouTube Video - Air horn instead of rooster.
At 7:03A on a Saturday morning, the
neighborhood was awaked by the blast of an air
horn, and by 7:10A there were nine dump trucks
on site. They represented over a hundred dump
truck loads that left the site today. And the
backhoe and dump trucks were the only
equipment working on a Saturday. (1:31 Min)
Friday, 22 November, 2013
- YouTube Video - No Lolligaging Today
Another full day of constructions activity around
the whole site. Over eighty dump truck loads of
dirt left the site. (1:36 min)
Thursday, 21 November, 2013
- YouTube Video - Early to bed and early to rise,
sure helps you manage construction surprise.
Again at 7:01A, the large backhoe was grinding
and beeping. [No, there was not an earthquake,
just a curious cat inspecting the webcam.] Today,
the backhoe worked in the southeast corner filling
a stream of dump trucks; the Jurassic Giraffe and
pilot-fish bulldozer worked in the northwest corner
(in left corner box); and the forklift moved i-
beams across the site. (1:20 min)
Wednesday, 20 November, 2013
☆ YouTube Video - Jurassic Giraffe Happy Dance
The Jurassic Giraffe (aka post hole digger/pile
driver) came downstage today to give the
webcam it’s first good look at the happy dance
that was happening the last two weeks along
Kanawha St. Dig a hole, shake out the dirt, dig
some more, shake out the dirt, put in an i-beam,
fill with cement. The small bulldozer acted like a
pilot fish, cleaning away the dirt the Jurassic
Giraffe dug out. (1:04 min)
Tuesday, 19 November, 2013
- VIDEO YouTube
Promptly at 7A the big backhoe was a work --
with all accompanying engine roar and back-up
beeps -- spreading gravel on north east quadrant.
Activity spread throughout the worksite with all
equipment busy most of the day. Work started
early and ended late.
Monday, 18 November, 2013
Continued welding, hole digging and sinking i-
beams in holes on the Connecticut Ave. and
Kanawha St. corner