Windows installed.

31 Jan 2015

Working back down in the dirt, Conn.and Kanawha.

30 Jan 2015

First window above first floor.

28 Jan 2015

Two trucks off-loading.

27 Jan 2015

74. Week of Monday, 26 January, 2015

        Welcome Live Stream Building Blog Slideshows Q&A Misc

Previous / Next

Monday, 26 January, 2015 to

Saturday, 31 January, 2015

Blog, Photos and Videos in reverse chronology.

Select thumbnail at the left for larger photo.

On Wednesday, 28 Jan., the first window above

the ground floor was installed -- on the fourth

floor. Very anti-climactic.

On 26 Jan, the Sr. Site Supervisor answered a

question about the purpose of each floor.