Friday, 07 March, 2014
- Video - Back to Work
- The backhoe started the day by disappearing
behind the Connecticut wall, digging, piling, and
preparing for a steady trickle of dump trucks that
started at 10A. The trucks were encumbered by
the process of backing from Military onto the site.
(1:27 min)
Thursday, 06 March, 2014
The backhoe started on time at 7A, working down
the Connecticut Ave wall, so deep the backhoe
almost disappeared from view. However by 9:30A,
the backhoe was parked, and there was no more
work on the site. Even the site manger left before
1P.
Wednesday, 05 March, 2014
At 8A, the bull dozer cleared snow along the
Connecticut Ave wall and the southern third of
site for about fifteen minutes. At 8:45A the
backhoe worked along the Connecticut Ave wall
less than an hour then abandoned the effort.
There was no more work on site. The site
manager sat in his truck and finally left at 2:45P.
Tuesday, 04 March, 2014
No Precipitation Snow Day
Monday, 03 March, 2014
Snow Day