5333 Connecticut Ave. Building Blog

Seven Floors

04 Oct 2014

White package of exterior windows.

04 Oct  2014

Gypsum wall for cellar and first floor North and Northwest sides.

04 Oct  2014

White package of exterior windows.

03 Oct  2014

Interior walls for Floor 1 and white package of windows.

03 Oct  2014

Compare: Big Picture from SE Corner.

03 Oct  2014

Level 10 aka Floor 7, SW corner.

30 Sep 2014

Seven floors from the SE corner.

30 Sep 2014

Compare: Big Picture from SE Corner.

30 Sep 2014

Putting in a side piece of the Level 10 puzzle.

29 Sep 2014

Laying the floor gang form for Level 10, closeup.

29 Sep 2014

Laying the floor gang form for Level 10.

29 Sep 2014

57. Week of Monday, 29 September, 2014

        Welcome Live Stream Building Blog Slideshows Q&A Misc

Previous / Next

Monday, 29 September, 2014 to

Saturday, 04 October, 2014

Blog, Photos and Videos in reverse chronology.

Select thumbnail at the left for larger photo.

Worked on Level 10 aka Floor 7. A Site Supervisor

pointed out the interior walls are already being

installed on Floor 1, and by the end of the week,

the frames for the exterior windows were being

hung on the NW Basement and Floor 1. (Yes,

basement window is an oxymoron.)