5333 Connecticut Ave. Building Blog
Seven Floors
04 Oct 2014
White package of exterior windows.
04 Oct 2014
Gypsum wall for cellar and first floor North and Northwest sides.
04 Oct 2014
White package of exterior windows.
03 Oct 2014
Interior walls for Floor 1 and white package of windows.
03 Oct 2014
Compare: Big Picture from SE Corner.
03 Oct 2014
Level 10 aka Floor 7, SW corner.
30 Sep 2014
Seven floors from the SE corner.
30 Sep 2014
Compare: Big Picture from SE Corner.
30 Sep 2014
Putting in a side piece of the Level 10 puzzle.
29 Sep 2014
Laying the floor gang form for Level 10, closeup.
29 Sep 2014
Laying the floor gang form for Level 10.
29 Sep 2014
57. Week of Monday, 29 September, 2014
Welcome
Live Stream
Building Blog
Slideshows
Q&A
Misc
Monday, 29 September, 2014 to
Saturday, 04 October, 2014
Blog, Photos and Videos in reverse chronology.
Select thumbnail at the left for larger photo.
Worked on Level 10 aka Floor 7. A Site Supervisor
pointed out the interior walls are already being
installed on Floor 1, and by the end of the week,
the frames for the exterior windows were being
hung on the NW Basement and Floor 1. (Yes,
basement window is an oxymoron.)