comparison of Monday, 28 July, 2014 to Saturday, 02 August, 2014

Southeast corner, looking North.

02 Aug 2014

Southeast corner trying to catch up.

02 Aug 2014

Fifth level, Southeast.

02 Aug 2014

Columns go up for fifth level.

02 Aug 2014

Big Picture.

02 Aug 2014

Site Closeup.

02 Aug 2014

Cementing.

01 Aug 2014

At gate drive into third level cellar.

01 Aug 2014

North side 3rd level cellar and 4th level first floor.

01 Aug 2014

Southeast corner, looking North.

01 Aug 2014

Multilevel site, from Southeast corner.

01 Aug 2014

Fifth level gang forms closeup.

01 Aug 2014

Southeast corner, looking North.

01 Aug 2014

Southeast corner, start of fifth level, 2.

01 Aug 2014

Southeast corner, start of fifth level.

01 Aug 2014

Big Picture

01 Aug 2014

Site Closeup.

01 Aug 2014

First grid, fourth level on Northwest  side.

31 July 2014

Second grid, fourth level on Southwest side.

31 July 2014

Fourth level, from the NE gate.

31 July 2014

North side looking South into third level, ground floor.

31 July 2014

Westside front of the building to Connecticut Ave.

31 July 2014

Storage on South side, fourth level.

31 July 2014

Meeting on South side, fourth level.

31 July 2014

Southeast corner, looking North.

31 July 2014

Southwest corner.

31 July 2014

Big picture, from across Connecticut Ave looking East.

31 July 2014

Southeast corner, looking Northwest.

30 July 2014

Southeast corner, looking Northwest.

30 July 2014

Stairwell in new cement.

30 July 2014

New cement, fourth level Southwest corner looking North.

30 July 2014

Big picture, from across Connecticut Ave looking East.

30 July 2014

Site Closeup.

30 July 2014

Still three levels down at the Southeast corner.

29 July 2014

Wire and rebar grid on the Southwest side.

29 July 2014

Site Closeup.

29 July 2014

48. Week of Monday, 28 July, 2014

        Welcome Live Stream Building Blog Slideshows Q&A Misc

Previous / Next

Monday, 28 July, 2014 to

Saturday, 02 August, 2014

Blog, Photos and Videos in reverse chronology.

Select thumbnail at the left for larger photo.

• Saturday, 02 August, 2014

What looked like a full crew worked on finishing

and maintaining the cement poured yesterday. As

usual, the crew broke for lunch at noon, but today

they did not return to work.

• Friday, 01 August, 2014

- Video - A Good Morning for Minutia

During today’s AM tour, we discovered yesterday

the fifth level was started in the Southeast corner.

Today, the West side center and Northwest side

received a good cementing.

• Thursday, 31 July, 2014

The crew removed the storage and built another

layer of wire and rebar grid on the existing-

cement of the Southwest side -- the first time the

Building Blog has seen a double layer of cement.

In addition, the crew continued on the wire and

rebar floor grid along the North side - and the

Southeast corner still lagged behind.

• Wednesday, 30 July, 2014

The Northeast side of the fourth level stretched all

across the North side of the lot, leaving the

Southeast corner the only portion of the building

still two levels down.

• Tuesday, 29 July, 2014

Cement was poured onto the wire and rebar grid

on the Southwest side of the fourth level, while a

similar wire and rebar grid was constructed on the

Northwest side of the fourth level. And of course,

there was catch-up work on the Southeast side,

which was still two levels below the rest of the

site.

• Monday, 28 July, 2014

Monday, 28 July, 2014

This week started as last week ended -- all of the

visual production happening on the East side. At

11A the crew boarded up the window-like hole,

which they cut the end of last week from the

cement wall, which they constructed the week

before -- go figure.