5333 Connecticut Ave. Building Blog
Select thumbnail for larger photo of
comparison of Monday, 28 July, 2014 to Saturday, 02 August, 2014
Southeast corner, looking North.
02 Aug 2014
Southeast corner trying to catch up.
02 Aug 2014
Fifth level, Southeast.
02 Aug 2014
Columns go up for fifth level.
02 Aug 2014
Big Picture.
02 Aug 2014
Site Closeup.
02 Aug 2014
Cementing.
01 Aug 2014
At gate drive into third level cellar.
01 Aug 2014
North side 3rd level cellar and 4th level first floor.
01 Aug 2014
Southeast corner, looking North.
01 Aug 2014
Multilevel site, from Southeast corner.
01 Aug 2014
Fifth level gang forms closeup.
01 Aug 2014
Southeast corner, looking North.
01 Aug 2014
Southeast corner, start of fifth level, 2.
01 Aug 2014
Southeast corner, start of fifth level.
01 Aug 2014
Big Picture
01 Aug 2014
Site Closeup.
01 Aug 2014
First grid, fourth level on Northwest side.
31 July 2014
Second grid, fourth level on Southwest side.
31 July 2014
Fourth level, from the NE gate.
31 July 2014
North side looking South into third level, ground floor.
31 July 2014
Westside front of the building to Connecticut Ave.
31 July 2014
Storage on South side, fourth level.
31 July 2014
Meeting on South side, fourth level.
31 July 2014
Southeast corner, looking North.
31 July 2014
Southwest corner.
31 July 2014
Big picture, from across Connecticut Ave looking East.
31 July 2014
Southeast corner, looking Northwest.
30 July 2014
Southeast corner, looking Northwest.
30 July 2014
Stairwell in new cement.
30 July 2014
New cement, fourth level Southwest corner looking North.
30 July 2014
Big picture, from across Connecticut Ave looking East.
30 July 2014
Site Closeup.
30 July 2014
Still three levels down at the Southeast corner.
29 July 2014
Wire and rebar grid on the Southwest side.
29 July 2014
Site Closeup.
29 July 2014
48. Week of Monday, 28 July, 2014
Welcome
Live Stream
Building Blog
Slideshows
Q&A
Misc
Monday, 28 July, 2014 to
Saturday, 02 August, 2014
Blog, Photos and Videos in reverse chronology.
Select thumbnail at the left for larger photo.
Saturday, 02 August, 2014
What looked like a full crew worked on finishing
and maintaining the cement poured yesterday. As
usual, the crew broke for lunch at noon, but today
they did not return to work.
Friday, 01 August, 2014
- Video - A Good Morning for Minutia
During today’s AM tour, we discovered yesterday
the fifth level was started in the Southeast corner.
Today, the West side center and Northwest side
received a good cementing.
Thursday, 31 July, 2014
The crew removed the storage and built another
layer of wire and rebar grid on the existing-
cement of the Southwest side -- the first time the
Building Blog has seen a double layer of cement.
In addition, the crew continued on the wire and
rebar floor grid along the North side - and the
Southeast corner still lagged behind.
Wednesday, 30 July, 2014
The Northeast side of the fourth level stretched all
across the North side of the lot, leaving the
Southeast corner the only portion of the building
still two levels down.
Tuesday, 29 July, 2014
Cement was poured onto the wire and rebar grid
on the Southwest side of the fourth level, while a
similar wire and rebar grid was constructed on the
Northwest side of the fourth level. And of course,
there was catch-up work on the Southeast side,
which was still two levels below the rest of the
site.
Monday, 28 July, 2014
Monday, 28 July, 2014
This week started as last week ended -- all of the
visual production happening on the East side. At
11A the crew boarded up the window-like hole,
which they cut the end of last week from the
cement wall, which they constructed the week
before -- go figure.