Saturday, 29 March, 2014
☆ Video - In spite of the rain, a good
construction-watching day.
- Precisely at 6:58A the baby dozer tidied the
upper site for the large cement pumping truck
that arrived at 7:03A, and by 7:42A the first of
fifty cement trucks was dumping its load via the
pumping truck to the south retaining wall. The
rain arrived at the same time and finally washed
out all site work at 12:15P. The cement pumping
truck was gone by 1:10P and the site was closed
shortly after. (1:52 min)
Friday, 28 March, 2014
- Video - Usual Day.
The usual backhoe and dozer worked the site
until, as usual, at 9:30A the first wave of dump
trucks arrived; it took longer to fill the dump
trucks because they had to back onto the site, as
usual, and because the street level area of the
site was shrinking. In-between waves of dump
trucks, supplies were delivered and allocated
across the site. At 1:30P a small stream of
cement trucks were accommodated by the crane
and its cement funnel -- as usual. (2:12 min)
Thursday, 27 March, 2014
- Video
- At 6:50A the crane operator ascended. The
glare of the direct rising sun overpowered the ant-
like site work until 8:30A. As usual, at 9:30A the
first wave of dump trucks arrived. Although the
webcam could not capture it, the movements of
the crane implied significant work on the
Connecticut retainer wall. There was a stream of
dump trucks the rest of the work day, joined by
several cement trucks. At 3:30 the crane
operator descended. (2:02 min)
Wednesday, 26 March, 2014
- Video - Tedious Until...
A rather tedious looking workday until 11:11A
when the first of thirteen cement trucks arrived
on site with a queue of cement trucks front and
center on Connecticut Ave. Each truck filled two
crane cement funnels, and all of the cement
disappeared into the unseen construction along
the Connecticut Ave. wall. (3:39 min)
Tuesday, 25 March, 2014
- Video - Spring Snow
- While winter snows halted production, all the
crew and machines pushed through this spring
snow. Supplies were deliver and redistributed
around the site. The three -- resident orange,
Hertz yellow, and now Deere yellow -- backhoes
dug. A crew worked at street level on
Connecticut. Just after 1P a cement truck
ventured no further than the gate, but the new
site crane easily retrieved the cement in its
cement funnel. (4:14 min)
Monday, 24 March, 2014
- Video
- This dusk for the first time the webcam noticed
the lights on in the mobile trailer offices on the
south east corner. The site crane operator
climbed the tower precisely at 7A. At 9:30A the
first dump truck of the first wave (inefficiently)
backed onto the site. At 10:30A two large funnels
for the site crane were delivered followed closely
by their transfer to the pit at the bottom of the
crane. At 11:30A two very big blue barrels were
deliver. At 12N the next wave of dump trucks
arrived interrupted briefly by a delivery truck. At
2P a smaller wave of dumps trucks started, and
just before 3P the first cement truck loaded the
cement funnel for the site crane to deliver. At
3:35P the crane operator descended. (4:29 min)