End the week with Level 11 aka Floor 8 -- still.

16 Oct 2014

Outside window frames.

16 Oct 2014

Inside wall frames_2.

16 Oct 2014

Inside wall frames_1.

16 Oct 2014

Begin the week with Level 11 aka Floor 8.

13 Oct 2014

59. Week of Monday, 13 October, 2014

        Welcome Live Stream Building Blog Slideshows Q&A Misc

Previous / Next

Monday, 13 October, 2014 to

Saturday, 18 October, 2014

Blog, Photos and Videos in reverse chronology.

Select thumbnail at the left for larger photo.

The week started on Floor 8, but work slowed for

several rain days, which must have delayed the

start of Floor 9.