Previous / Next
Monday, 11 May, 2015 to
Sunday, 17 May, 2015
Blog, Photos and Videos in reverse chronology.
Select thumbnail at the left for larger photo.
Sunday, 17 May, 2015
Delayed by the rain yesterday evening, the
mobile crane was finally disassembled by late
afternoon.
Saturday, 16 May, 2015
Just as it was assembled Friday, 21 March, 2014
during Week 29, the site crane came down piece
by piece.
Friday, 15 May, 2015
- Friday evening the large MAXIM, mobile crane
arrived and was assembled during the evening and
into the night, blocking four of the six lanes of
Connecticut Ave traffic and closing Kanawha St
east side.
- 5333 Connecticut Construction Crane Removal
this Weekend
Fri May 15, 2015 7:11 am (PDT) . Posted by:
"Randy Speck"
At 9:00 am on May 15, I received the following
notice from the construction manager at 5333
Connecticut regarding the removal of the
construction crane from the site:
I was just advised that the crane needed to
remove the tower crane from the project has
been repaired and is available for this weekend.
Further, the weather forecast is favorable and the
City has no objection for the originally planned
tower crane removal to occur this weekend. This
will allow us to avoid having to do this work on
Memorial Day weekend.
To briefly condense the previously provided plan
[a lengthy description of the technical steps in the
process] that was provided you:
· set up will start this evening,
· the actual disassembling of the tower crane will
start Saturday morning and
· demobilization will be finished before the sun
comes up on Sunday.
Randy Speck
Chair, ANC 3/4G