Monday, 06 October, 2014 to
Saturday, 11 October, 2014
Blog, Photos and Videos in reverse chronology.
Select thumbnail at the left for larger photo.
Work finished on Floor 7 and started on Floor 8.
The "frame for the exterior windows" from last
week, turned out to be gypsum board that will be
the backing for a brick wall in between the
windows of the cellar and the first floor, but only
on the North and Northwest sides. This outside
brick and the inside wall structures are being
installed by a subcontractor new to the site.
Saturday's rain attracted only a few crew in the
early afternoon most of them from this new inside
crew.