Friday, 06 June, 2014
Three levels are prominent. The first level -- the
bottom floor of the garage -- is visible on the
north side as the cement crew prepare to put up
the garage ramp. The gang forms, which look like
an exoskeleton, are being prepared for the third
deck -- the first floor -- on the south side of the
site. The visuals are tedious and best captured by
closeup still photos.
Thursday, 05 June, 2014
- Video - Ant hill at work, with the majority of
work behind the trees.
In a photo to the left, in the far right corner (SE)
you can now see three floors - two garage decks
and the exoskeleton of the third deck of first floor.
Wednesday, 04 June, 2014
Repeat of last two days, right down to the
weather.
Tuesday, 03 June, 2014
Repeat of yesterday, right down to the weather.
Monday, 02 June, 2014
Today’s work was on the Connecticut Ave side of
the second deck. The mystery of the leftover soil
was solved; is was kept as backfill under the
garage ramp, which is on the north side. A green
robot the size of a lawn tractor labored back and
forth over the dirt compacting it solid.