Previous / Next
Monday, 01 December, 2014 to
Saturday, 06 December, 2014
Blog, Photos and Videos in reverse chronology.
Select thumbnail at the left for larger photo.
Work on Floor 10, the Roof, was difficult to see
except for a small fraction around the permitter,
so the Blog had to be satisfied watching a lower
level of activity -- an irony since the naked trees
provided a better view. The main activity was
work on the interior walls and infrastructure.